Billet/Round F-EMS

    It is generally installed in the final stage where the molten core is 25%-35% of the width of the billet. The main function is to improve the equiaxed crystal rate of the billet, improve the center porosity and shrinkage , and improve the center segregation and v-shape segregation.

     

    It is generally installed in the final stage where the molten core is 25%-35% of the width of the billet. The main function is to improve the equiaxed crystal rate of the billet, improve the center porosity and shrinkage , and improve the center segregation and v-shape segregation.

    HUNAN KEMEIDA ELECTRIC CO., LTD. All Rights Reserved           湘公網(wǎng)安備43060402000026號(hào)        湘ICP備16013601號(hào)-1   
    亚洲欧美日韩伦中文,无码精品久久久久电影,天堂综合av系列,亚洲日本va中文字幕